Camp Pendleton Hospital

Camp Pendleton, CA

Client:

United States Marine Corps

Architect:

HKS Architects

Contract Value:

$90,000,000

Year Completed:

2013

Sector:

Hospitals and Laboratories

Camp Pendleton Hospital

Camp Pendleton, CA

About:

The Camp Pendleton Naval Hospital replacement project is one of the largest Recovery Act projects within the Department of Defense and plays a critical role for the support and care of the local military families in the Camp Pendleton area.

This hospital is 500,000 sq. ft., 4 stories high + mechanical penthouses. As a full service hospital it includes inpatient, outpatient, surgical suites, emergency rooms, labor/delivery, dentistry, othamology, medical offices, kitchen/ cafeteria, and a central plant. Included with the hospital is a 1,500 space, multi-level parting structure, surface parking, side development and associated supporting facilities.

A.O. Reed’s contribution included HVAC & Plumbing to this project.

READ MORE

Verenium

San Diego, CA

Client:

Verenium

Architect:

DGA Planning

Year Completed:

2012

Sector:

Hospitals and Laboratories

Verenium

San Diego, CA

About:

The Verenium was a Design Assist project built to accommodate the enzyme discovery research and development labs, molecular diversity, product technical support and quality control.

This new facility consisted of 42,000 s.f. of 2 levels of office space, 1 level of lab facilities and a basement.

A.O. Reed’s scope of work included HVAC, Plumbing and process systems. We also added capacity to the existing central plant, provided steam boilers, FCU’s, Phoenix Controls, DDC System, vacuum, compressed air, deionized water, as well as clean in place and culinary steam.

READ MORE

San Diego County Medical Examiners & Forensics Lab

San Diego, CA

Client:

County of San Diego

Architect:

Harley Ellis Devereaux

Contract Value:

$9,351,672

Year Completed:

2010

Sector:

Hospitals and Laboratories

San Diego County Medical Examiners & Forensics Lab

San Diego, CA

About:

This two story above grade forensic laboratory plus basement with autopsy & necropsy facilities has a total of 90,710 sq. ft. The basement has disposal capabilities to handle necropsy waste, decontamination equipment together with plumbing waste from the BSL-3.

The structure also contains a bereavement center, classrooms and electronic touchscreens at exam stations.

Three rooftop air handlers and manufactured exhaust plenum were installed for lab exhaust. Related Central Plant construction was also performed concurrently with this construction project.

The Medical Examiners Office & Lab is in the process of being certified LEED Gold.

UCSD Sanford Consortium for Regenerative Medicine (SCRM)
READ MORE

UCSD Sanford Consortium for Regenerative Medicine (SCRM)

La Jolla, CA

Client:

UCSD Sanford Consortium for Regenerative Medicine (SCRM)

Architect:

Davis Davis Architects

Contract Value:

$14,137,095

Year Completed:

2010

Sector:

Hospitals and Laboratories

UCSD Sanford Consortium for Regenerative Medicine (SCRM)

La Jolla, CA

About:

This four-story, 146,000 square foot stem cell research facility contains research areas, administrative areas, a 16,000 square foot vivarium and an enclosed area for observing plant and animal life.

The consortium was a joint effort of the University of California, San Diego, the Sanford-Burnham Medical Research Institute, The Salk Institute for Biological Studies and the Scripps Research Institute.

A.O. Reed’s contribution included the installation of 166 chilled beams, 406 Phoenix valves, a 1000 ton central plant and all laboratory process piping.

This $115 million dollar project was Design-Assist, REVIT modeling was required and the project has LEED Gold certification.

Rady Children’s Hospital
READ MORE

Rady Children’s Hospital

San Diego, CA

Client:

Children's Healthcare

Architect:

Anshen & Allen Architects

Contract Value:

$37,708,000

Year Completed:

2010

Sector:

Hospitals and Laboratories

Rady Children’s Hospital

San Diego, CA

About:

The new Rady Children’s Hospital Acute Care Tower is a $260 Million dollar, 279,000 square foot project. There are 442 beds including 84 medical-surgical beds, a neonatal intensive care unit (NICU) and a cancer center, 16 operating rooms, 28 bed hematology and oncology unit and a 10 bed bone marrow transplant intensive care unit.

A.O. Reed was responsible for installing 21 air handling units, 37 exhaust fans, 67 fan coil units, 10 humidifiers, 3 chillers and 3 cooling towers. Also included in the project was plumbing, water, medical gas, HHW/CHW piping, steam/condensate, HTHW piping and all HVAC duct systems.

Salk Institute
READ MORE

Salk Institute

La Jolla, CA

Client:

Salk Institute

Year Completed:

2012

Sector:

Hospitals and Laboratories

Salk Institute

La Jolla, CA

About:

Biological research facility. Remove & replace existing chillers, boilers, cooling tower, supply & exhaust fans in built up air handlers, replace all existing chill water & condenser water piping between pumps & equipment.  Replace all chilled & condenser water pumps, replace existing domestic hot water heat exchangers.

READ MORE

Sharp Hospital

San Diego, CA

Client:

Sharp Healthcare

Architect:

NBBJ

Contract Value:

$27,789,722

Sector:

Hospitals and Laboratories

Sharp Hospital

San Diego, CA

About:

The new 315,000 s.f. Sharp Hospital Expansion features a seven-story tower, 302 patient beds, along with shell space for an additional 32 beds. The tower includes 128 AC beds, 126 IMCU beds and 48 ICU beds as well as 10 operating rooms and a recovery suite. A complete emergency room department, new hospital entrance and lobby, and administrative department complete the new tower.

Renovation of the existing adjacent structure combined with central plant upgrades and substantial infrastructure improvements have resulted in a total campus upgrade.

This competitive bid project, includes OSHPD (Office of Statewide Health Planning & Development) approved construction. The facility is a structural steel frame with a curtain wall, metal panel and precast exteriors.

A.O. Reed provided the complete HVAC and plumbing upgrades and distribution to serve the new tower.

Sharp Reese Steely MOB
READ MORE

Sharp Rees-Stealy MOB

Client:

Sharp Rees-Stealy MOB

Sector:

Hospitals and Laboratories

Sharp Rees-Stealy MOB

About:

Clinical office building for primary and specialty care services including allergy, hematology and oncology. $10.7 million total construction cost; 2-story, 58,000 SF, steel frame building with glass and stucco exterior.  Facility includes clinical space for primary and specialty care services.  Specialty services include allergy, hematology and oncology, orthopedic PT, pulmonary medicine, and urology.  Our systems included plumbing and HVAC.

Scripps Research Institute
READ MORE

Scripps Research Institute

Client:

Scripps Research Institute

Sector:

Hospitals and Laboratories

Scripps Research Institute

About:

Research lab for immunology, molecular and cellular biology, chemistry, neurosciences, autoimmune diseases, cardiovascular diseases, virology and synthetic vaccine development.