Pharmavite
READ MORE

Pharmavite

Northridge, CA

Client:

Pharmavite

Sector:

Manufacturing, Industrial and Commercial Facilities

Pharmavite

Northridge, CA

About:

A Vitamin manufacturing facility which included the installation of a dehumidification system for pill drying tunnels. Installed new Kathabar unit, chiller, boiler and associated piping and ductwork to accommodate a new vitamin manufacturing facility.  Also installed new area drains and sewage ejector system.

Kyocera Corporation
READ MORE

Kyocera Corporation

Client:

Kyocera Corporation

Sector:

Manufacturing, Industrial and Commercial Facilities

Kyocera Corporation

About:

This cogeneration plant, operated for Kyocera America’s headquarters and manufacturing facility, is one of 28 such plants constructed by A.O. Reed, but included a solar electricity generation system as well. A.O. Reed served as both the prime and mechanical contractor. The cogeneration plant consists of four natural gas-fired Caterpillar lean-burn engines, producing 3.2 megawatts of electricity, plus a heat recovery system that produces chilled water for air-conditioning through the use of two 450-ton absorption chillers. A 100,000 gallon underground chilled water storage tank serves dual purposes of thermal storage and a reservoir for fighting fires. Part of the assignment was to convert equipment in Kyocera’s existing DX HVAC system to a chilled water system. This project also called for installing a rooftop 50 kilowatt solar energy system. built and supplied by Kyocera, consisting of flat-plate photovoltaic cells which convert sunlight directly into electricity.

John Wayne Airport
READ MORE

John Wayne Airport

Santa Ana, CA

Client:

John Wayne Airport

Sector:

Manufacturing, Industrial and Commercial Facilities

John Wayne Airport

Santa Ana, CA

About:

This multi-level steel and concrete structure is approximately 280,000 sq.ft. with 6 bridged aircraft gates and 2 new, permanent facilities serving up to 3 commuter / regional jets at the south end of the new terminal.  A.O. Reed is responsible for the HVAC portion of this project.

UCSD Central Plant 3
READ MORE

UCSD Central Plant 3

San Diego, CA

Client:

UCSD Central Plant 3

Sector:

Manufacturing, Industrial and Commercial Facilities

UCSD Central Plant 3

San Diego, CA

About:

A.O. Reed provided an increase of 4,000 tons to the existing central plant within the existing structure including a dual cell cooling tower with associated mechanical and electrical and an addition to the existing emergency generator building.

R.W. Johnson Pharmaceuticals
READ MORE

R.W. Johnson Pharmaceuticals

San Diego, CA

Client:

R.W. Johnson Pharmaceuticals

Sector:

Manufacturing, Industrial and Commercial Facilities

R.W. Johnson Pharmaceuticals

San Diego, CA

About:

This new 3-story, 122,300 SF Pharmaceutical Research, Biology and Chemistry Laboratories facility was built for Johnson & Johnson. Our portion of this project consisted of installation of a complete HVAC and plumbing system including steam and clean steam. Also included in the project are heating boilers @ 13 million BTU, 2-600 ton chillers, 2-600 ton cooling towers, 2-6,500 MBH hot water boilers, 3-100 hp steam boilers, 6 AHs (2 Pace 125,000 CFM) totaling 284,980, Strobic lab exhaust system, 15 pumps, 223,000 lbs of galvanized & s/s ductwork, and Phoenix constant and VAC systems for 166 fume hoods, large capacity exhaust fans, and heat exchangers. The plumbing and piping portion of the project included RO & DI water, domestic hot & cold water, industrial water, reclaimed water, compressed air, vacuum. Pure gases included N2, CO2, and hydrogen. Natural gas, process steam, sanitary waste & vent, acid waste, and storm drains. There was 21,570 ft of purity piping installed, 700+ fixtures.

Antelope Valley Courthouse
READ MORE

Antelope Valley Courthouse

Los Angeles, CA

Client:

Antelope Valley Courthouse

Sector:

Manufacturing, Industrial and Commercial Facilities

Antelope Valley Courthouse

Los Angeles, CA

About:

This was a new 4-story, 325,000 SF courthouse with 8 superior courtrooms, 70 prison cells for the LA County Sheriff. A.O. Reed installed a complete HVAC and plumbing system throughout.

READ MORE

Amgen Building 29

Thousand Oaks, CA

Client:

Amgen Building 29

Sector:

Manufacturing, Industrial and Commercial Facilities

Amgen Building 29

Thousand Oaks, CA

About:

This new 4-story, 384,000 SF research and 2-story underground, 224,000 SF parking structure included the installation of plumbing systems with roof drains, waste & vent, natural gas, hot & cold water, LN2, CO2, N2, compressed air, vacuum, DI water and acid lab waste; totaling over 25 miles of pipe.

READ MORE

Ontario International Airport Expansion

Ontario, CA

Client:

Ontario International Airport Expansion

Sector:

Manufacturing, Industrial and Commercial Facilities

Ontario International Airport Expansion

Ontario, CA

About:

This project included the construction of two 2-story terminal buildings totaling 556,226 SF, and tripled the size of the airport terminals. A.O. Reed installed the following: 2-525 and 3-375 ton chillers, 2-2 cell and 3-2 cell cooling towers totaling 2,175 tons, 5-1,900 MBH hot water boilers, 34 AHs totaling 391,000 cfm the largest being 30,600 cfm, 45 EFs, 10 SFs, 568,793 lbs. of ductwork, 6 factory fabricated pump stations and 6 individual pumps. The plumbing portion included 312 trapped fixtures, public & private restrooms, grease interceptors and services to stores and restaurants.

Cal Poly Pomona Central Plant
READ MORE

Cal Poly Pomona Central Plant

Pomona, CA

Client:

Cal Poly Pomona Central Plant

Sector:

Manufacturing, Industrial and Commercial Facilities

Cal Poly Pomona Central Plant

Pomona, CA

About:

A.O. Reed was the prime contractor responsible for constructing a new central plant building with 3,750 tons of cooling and a 3.1 million gallon thermal storage tank. There is over 3 miles of 24” direct buried chilled water piping serving 13 buildings of this project.