Pharmavite
READ MORE

Pharmavite

Northridge, CA

Client:

Pharmavite

Sector:

Manufacturing, Industrial and Commercial Facilities

Pharmavite

Northridge, CA

About:

A Vitamin manufacturing facility which included the installation of a dehumidification system for pill drying tunnels. Installed new Kathabar unit, chiller, boiler and associated piping and ductwork to accommodate a new vitamin manufacturing facility.  Also installed new area drains and sewage ejector system.

Kyocera Corporation
READ MORE

Kyocera Corporation

Client:

Kyocera Corporation

Sector:

Manufacturing, Industrial and Commercial Facilities

Kyocera Corporation

About:

This cogeneration plant, operated for Kyocera America’s headquarters and manufacturing facility, is one of 28 such plants constructed by A.O. Reed, but included a solar electricity generation system as well. A.O. Reed served as both the prime and mechanical contractor. The cogeneration plant consists of four natural gas-fired Caterpillar lean-burn engines, producing 3.2 megawatts of electricity, plus a heat recovery system that produces chilled water for air-conditioning through the use of two 450-ton absorption chillers. A 100,000 gallon underground chilled water storage tank serves dual purposes of thermal storage and a reservoir for fighting fires. Part of the assignment was to convert equipment in Kyocera’s existing DX HVAC system to a chilled water system. This project also called for installing a rooftop 50 kilowatt solar energy system. built and supplied by Kyocera, consisting of flat-plate photovoltaic cells which convert sunlight directly into electricity.

R.W. Johnson Pharmaceuticals
READ MORE

R.W. Johnson Pharmaceuticals

San Diego, CA

Client:

R.W. Johnson Pharmaceuticals

Sector:

Manufacturing, Industrial and Commercial Facilities

R.W. Johnson Pharmaceuticals

San Diego, CA

About:

This new 3-story, 122,300 SF Pharmaceutical Research, Biology and Chemistry Laboratories facility was built for Johnson & Johnson. Our portion of this project consisted of installation of a complete HVAC and plumbing system including steam and clean steam. Also included in the project are heating boilers @ 13 million BTU, 2-600 ton chillers, 2-600 ton cooling towers, 2-6,500 MBH hot water boilers, 3-100 hp steam boilers, 6 AHs (2 Pace 125,000 CFM) totaling 284,980, Strobic lab exhaust system, 15 pumps, 223,000 lbs of galvanized & s/s ductwork, and Phoenix constant and VAC systems for 166 fume hoods, large capacity exhaust fans, and heat exchangers. The plumbing and piping portion of the project included RO & DI water, domestic hot & cold water, industrial water, reclaimed water, compressed air, vacuum. Pure gases included N2, CO2, and hydrogen. Natural gas, process steam, sanitary waste & vent, acid waste, and storm drains. There was 21,570 ft of purity piping installed, 700+ fixtures.

SoiTec
READ MORE

SoiTec

San Diego CA

Client:

SoiTec

Sector:

Manufacturing, Industrial and Commercial Facilities

SoiTec

San Diego CA

About:

A single story production building (SMB1) to manufacture concentrate Photovoltaic Solar Panels. Building is 165,600 SF and includes shipping, receiving, office space and production floor. Scope of work includes Plumbing, Process Piping, Mechanical Piping and Sheet-metal. At this time the Process Equipment Skids, Air Handling Units, Chillers, Cooling Towers & Boilers are provided by owner and set by A.O. Reed & Co.

Callaway Golf Manufacturing
READ MORE

Callaway Golf Manufacturing Facility

Carlsbad, CA

Client:

Callaway Golf Manufacturing Facility

Sector:

Manufacturing, Industrial and Commercial Facilities

Callaway Golf Manufacturing Facility

Carlsbad, CA

About:

This design build, 2-story, 250,000 SF project included both manufacturing and offices to house Callaway’s corporate headquarters. It consisted of 49 air handling units, a central cooling / heating plant with 3,700 tons of cooling and process piping within the manufacturing area.

NCR Corporation
READ MORE

NCR Corporation

Client:

NCR Corporation

Sector:

Manufacturing, Industrial and Commercial Facilities

NCR Corporation

About:

Constructed 4,763 SF building, four 650 Kw engines, 660 ton waste heat absorption chiller.  We were Prime & Mechanical Contractor for this project.  New manufacturing plant that included offices and a cogen plant.  We provided the construction services and mechanical systems installation.