Navy BEQ 405
READ MORE

Navy BEQ P-405

San Diego, CA

Client:

Navy BEQ P-405

Sector:

Military Facilities

Navy BEQ P-405

San Diego, CA

About:

Seven story BEQ with Community Center and 162 living suites. Central plant with Air Cooled Chiller (250 ton), HHW Boiler & pumps for CHW & HHW.  Single FCU in kitchen area of living unit with ducted outlets serving each sleeping room.

 

Navy Pier 12
READ MORE

Navy Pier 12 – P327

San Diego, CA

Client:

Navy Pier 12 – P327

Sector:

Military Facilities

Navy Pier 12 – P327

San Diego, CA

About:

Design build. Navy pier 1500 ft. long, including piping services.

Coronado BEQ
READ MORE

Navy BEQ Coronado, P-742

Coronado, CO

Client:

Navy BEQ Coronado, P-742

Sector:

Military Facilities

Navy BEQ Coronado, P-742

Coronado, CO

About:

The Navy has broken ground on the Bachelor Enlisted Quarters (BEQ) at Navy Base Coronado.  The project will include the construction of a, 7 story building approximately, 198,920 sq.ft. in size.  Each of the 262 modules will include a living area, four walk-in closets, stackable washers & dryers, kitchenettes and semi-private baths.  Extra measures have been taken to include fire protection, anti terrorism/force protection and data information systems.  A.O. Reed & Co will be providing the HVAC, Plumbing and Piping for this $68,000,000 project.

READ MORE

U.S. Navy Measurement Lab

Corona, CA

Client:

U.S. Navy

Architect:

Larsen Carpenter

Sector:

Military Facilities

U.S. Navy Measurement Lab

Corona, CA

About:

The Naval Surface Warfare Center (NSWC), Corona Division, is the Navy’s only independent technology analysis and assessment center. This new facility is in a 39,000 sq. ft. single-story building and is earmarked to be Navy’s primary measurement facility. It contains laboratories, administrative as well as warehouse space. Its purpose: to provide critical measurement analysis of numerous top-secret military weapons and their related devices.

For the U.S. Navy’s Measurement Laboratory, the precision measurements required the lab areas to be maintained at a constant temperature with only ±0.5oF from the floor to the ceiling.

A.O. Reed & Co. received the 2002 Design/ Build Award for its contribution to this project from Contracting Business Magazine for High Technology Laboratory.