San Diego Unified School District
READ MORE

San Diego Unified School District

San Diego, CA

Client:

San Diego Unified School District

Sector:

Educational Facilities

San Diego Unified School District

San Diego, CA

About:

  • Correia Middle School
  • Dana Middle School
  • Hoover High School
  • Lincoln High School
  • Point Loma High School
Soka University
READ MORE

Soka University

Aliso Viejo, CA

Client:

Soka University

Sector:

Educational Facilities

Soka University

Aliso Viejo, CA

About:

  • Underground Chilled Water

Sitework prepared for construction of a 103-acre university campus which opened August 2001. A.O. Reed prime, 6,000 ft. long trench for pre insulated PVC CHW supply and return lines, 11 vaults, future connections for buildings; 400 ft 24″ FRP CW lines. Installation designed by A.O. Reed CAD.

University of California, Los Angeles
READ MORE

University of California, Los Angeles

Los Angeles, CA

Client:

University of California, Los Angeles

Sector:

Educational Facilities

University of California, Los Angeles

Los Angeles, CA

About:

  • Anderson Graduate School of Mgmt
  • Gonda Neuroscience
University of California, San Diego
READ MORE

University of California, San Diego

San Diego, CA

Client:

University of California, San Diego

Sector:

Educational Facilities

University of California, San Diego

San Diego, CA

About:

  • Cal-(IT)² – Atkins Hall
  • Cancer Reseach Center
  • Central Library & Rare Books
  • Central Plant Improvements 1, 2, & 3
  • Engineering Research Building – EBU II, EBU II
  • Mandeville Center
  • North Campus Phase II
  • Student Residence Halls and Cafeteria
  • San Diego Supercomputer Center
  • Third College Utilities
  • Undergrad. Science and Lab Building
  • Warren Loop – Phase II
  • Powell Focht Bio Engineering
University of San Diego
READ MORE

University of San Diego

San Diego, CA

Client:

University of San Diego

Sector:

Educational Facilities

University of San Diego

San Diego, CA

About:

  • Administration Building
  • Apartment Complex
  • Gymnasium and Swimming Pool
  • Law Library
  • Manchester Child Development Ctr.
  • Shiley Theater
California State Prisons
READ MORE

California State Prisons

Client:

California State Prisons

Sector:

Correctional Institutions

California State Prisons

About:

These new medium-security prisons consisted of plumbing and HVAC for twenty 2-story prisoner housing units each. The projects included connections of the HVAC systems to the Central Plant distribution lines and the installation of 80 AHU’s and 400 EF’s per prison.

  • Blythe
  • Calipatria
  • Donovan
  • Lancaster
  • San Diego Metropolitan Correctional Ctr.
  • Santa Ana Police Administration and Holding Facility
  • Seeley
  • Taft Federal Correctional Institution
  • Ventura County Jail
Escondido Center for the Performing Arts Ice Storage
READ MORE

Escondido Center for the Performing Arts Ice Storage

Client:

Escondido Center for the Performing Arts Ice Storage

Sector:

Educational Facilities

Escondido Center for the Performing Arts Ice Storage

About:

5 buildings make-up the art center. This includes 2 theaters, a conference center, an art exhibit building and a central plant. 124,000 SF. Plumbing piping, fire protection and HVAC.

READ MORE

Children’s Hospital Tower

Client:

Children’s Hospital Tower

Sector:

Hospitals and Laboratories

Children’s Hospital Tower

About:

This 24,000 sq. ft. project is a prime contract that included the demolition of an existing four engine cogeneration system, jacket water heat exchangers, absorption and electric chillers, cooling towers and associated auxiliary equipment.  The existing 2-story Clinical laboratory building was structurally upgraded for installation for four new cooling towers and condenser water pumps, and to meet current seismic codes.  The roof of the adjacent cogeneration building was removed for installation of a new 3.5 turbine engine generator system and the structure modified to support a new high temperature hot water heat recovery boiler, two stand-by boilers, auxiliary equipment, and to meet current seismic codes.  The project also included installation of 2 new 700 ton absorption chillers, new medical air compressors, vacuum pumps and medical gas systems.  New electrical switchgear was installed to accommodate the increased system capacity.  The cogeneration system was installed for parallel operation and “island mode” operation.  All work had to be accomplished while the hospital facilities were occupied and in full operation.

City of Hope National Medical Center
READ MORE

City of Hope National Medical Center

Duarte, CA

Client:

City of Hope National Medical Center

Sector:

Hospitals and Laboratories

City of Hope National Medical Center

Duarte, CA

About:

217 bed hospital, 84 beds dedicated to bone marrow transplant patients. We provided the Underground Steam & Chilled Water Distribution System.  Excavation over one mile trenches through high traffic areas of campus, installed over five miles of piping, twelve miles of conduit, over 30 manholes & vaults; built half mile of roadway, street repair.  Installed a 5,000 linear foot utility corridor containing chilled, steam, and 12 KVA electrical distribution in an existing 75-year old campus to feed utilities to 20 structures.  Extreme difficulties due to existing underground piping, changes in elevation and requirement to maintain proper grades on piping systems.  Existing monumental and memorial structures had to be maintained and properly stored to protect from trenching operations.  Continuous and uninterrupted service to the hospital complex was maintained while the improvements were being constructed.