UC Irvine McGaugh Vivarium
READ MORE

UC Irvine McGaugh Vivarium

Irvine, CA

Client:

UC Irvine McGaugh Vivarium

Sector:

Educational Facilities

UC Irvine McGaugh Vivarium

Irvine, CA

About:

Design Assist project consisting of 60,000 square feet of vivarium space.

UC Irvine CSU-3
READ MORE

UC Irvine CSU-3

Irvine, CA

Client:

UC Irvine CSU-3

Sector:

Educational Facilities

UC Irvine CSU-3

Irvine, CA

About:

A.O. Reed’s scope of work included the Design-Build plumbing for a computer science facility. This project consisted of a 6-story, 123,000 sq. ft. office building and a 2-story, 23,000 sq. ft. classroom building.

AOReed Logo
READ MORE

Columbia Centre (Currently First National Bank)

Client:

Columbia Centre

Sector:

Financial Institutions

Columbia Centre (Currently First National Bank)

About:

A.O. Reed installed all plumbing, heating, ventilating and air conditioning systems. Because the building has two structures (a 27-story high-rise and a connecting 3-story structure) which are seismically independent of each other, all interconnecting piping and ventilating duct systems required special seismic vibration isolation. All sinks on the first and second floors of the high-rise and those in the 3-story structure are connected to a sewage ejection system. Eight duplex sump pumps were installed to remove ground water caused by underground parking and floor levels. Another unique feature was the installation of two 17′ exhaust fans, the largest ever installed in San Diego. These fans are used to exhaust the carbon monoxide fumes from the parking structure.

AOReed Logo
READ MORE

First Interstate Bank (Currently Wells Fargo)

Client:

First Interstate Bank (Currently Wells Fargo)

Sector:

Financial Institutions

First Interstate Bank (Currently Wells Fargo)

About:

562,000 sq. ft. office building, 2-700 ton chillers, 4.6 MBTU boiler, 24 air handlers totaling 1.2 million CFM, 4 level UG parking. We installed the plumbing, HVAC, and tenant improvement systems. The mechanical system involved installation of a 4.6 million BTU boiler, two 700-ton centrifugal chillers, a cooling tower and air distribution.

WaveTek (Currently Kaplan College)
READ MORE

WaveTek (Currently Kaplan College)

Client:

WaveTek (Currently Kaplan College)

Sector:

Educational Facilities

WaveTek (Currently Kaplan College)

About:

Replaced two 20 ton gas/electric packaged roof-top units with curbs on existing manufacturing facility.

United Airlines – LAX
READ MORE

United Airlines – LAX

Los Angeles, CA

Client:

United Airlines – LAX

Sector:

Manufacturing, Industrial and Commercial Facilities

United Airlines – LAX

Los Angeles, CA

About:

Renovation of Terminals 6 & 7.  Included relocation or installation of new lavatories, kitchens, bars, equiment & mechanical rooms. Terminal 8 was also expanded and included a new mechanical equipment room, rooftop air handler units, new restaurants, bars, and lavatories.

Salvation Army
READ MORE

Salvation Army

Client:

Salvation Army

Sector:

Manufacturing, Industrial and Commercial Facilities

Salvation Army

About:

Renovation of existing 4-story office building with parking garage.  Entire building was impacted except for a portion of 2nd floor occupied by another.  (we had to work around this existing tenant during construction.  Temporary HVAC systems were installed to provide air to this tenant.  We also needed to maintain this tenant’s existing dual-duct system).  Existing parking garage area was not modified.  Total gross area:  36,551 SF.  Total T.I. Area:  27,030 SF.  We demolished majority of existing duct systems.  Installed new duct throughout bldg. (not the occupied area).  New system was a single-duct VAV arrangement with hot water reheat coils.  Existing system retained existing pneumatic controls while remainder of bldg was installed with DDC controls.  Installed two air handlers, total 52,000 CFM and largest one with 40,000 CFM, one 130-ton chiller, one boiler (90 gpm, 1,083,000 btuh), one pump, one 1.5-ton computer room fan coil unit, 76 VAV terminal boxes, DDC controls, duct cleaning of existing systems, insulation & air and water balance by NEBB-certified A.O. Reed personnel.  Existing 375 gpm cooling tower, one 25 gpm reheat coil.  4,371 LF of pipe, largest 4″; 21,867 lbs. of ductwork with largest duct 52×50.    We installed hot water heating piping mains and branch piping from existing penthouse rooftop central plant.  New piping is for new VAV boxes with reheat coils.

Relera Telecommunications (Currently Amilyn)
READ MORE

Relera Telecommunications (Currently Amilyn)

Client:

Relera Telecommunications (Currently Amilyn)

Sector:

Manufacturing, Industrial and Commercial Facilities

Relera Telecommunications (Currently Amilyn)

About:

50,000 square ft. web-hosting server facility with raised floors, 72 25-ton CRAC units.  Included condenser water cooling system.

Raytheon
READ MORE

Raytheon

Client:

Raytheon

Sector:

Manufacturing, Industrial and Commercial Facilities

Raytheon

About:

An existing electronics lab that also included offices.  Two buildings; one 1-story w/offices and one 2-story with 150,000 SF of lab space.  The project included VAV with DDC controls, chillers, computer room AC units (CRAC), and DI water system.