Qualcomm Central Plant Building “P”
READ MORE

Qualcomm Central Plant Building “P”

San Diego, CA

Client:

Qualcomm Central Plant Building “P”

Sector:

Manufacturing, Industrial and Commercial Facilities

Qualcomm Central Plant Building “P”

San Diego, CA

About:

This project included expanding Qualcomm’s existing Building “P” Central Plant by increasing the chiller capacity by 1,300 tons with the addition of a new absorption chiller and increasing their Co-Generation capacity by 4Mw with a new turbine generator.

Pomerado OSP T.I.
READ MORE

Pomerado OSP T.I.

San Diego, CA

Client:

Pomerado OSP T.I.

Sector:

Manufacturing, Industrial and Commercial Facilities

Pomerado OSP T.I.

San Diego, CA

About:

Design Assist medical office building at a total size of area of 60,000 square feet.

Linkabit Corporation
READ MORE

Linkabit Corporation

Client:

Linkabit Corporation

Sector:

Manufacturing, Industrial and Commercial Facilities

Linkabit Corporation

About:

3-story aerospace communications office and research building project consisted of the installation of general plumbing and heating, ventilation and air conditioning systems in a new steel frame building. We worked in close coordination with the owner, Architect, Design Engineer and General Contractor to complete the project within the owner’s budget and time frame.

La Jolla Gateway II
READ MORE

La Jolla Gateway II

La Jolla, CA

Client:

La Jolla Gateway II

Sector:

Manufacturing, Industrial and Commercial Facilities

La Jolla Gateway II

La Jolla, CA

About:

A.O. Reed installed all base plumbing and HVAC systems and worked on individual tenant suites. We used a unique direction expansion air conditioning system which does not use water. Instead, the system pumps liquid R-22 refrigerant directly into two 14′x12′ expansion coils of the supply air plenum. Four 125-ton refrigeration compressors produce the cooling medium and twin 150-horsepower fans cool the air and move it through a central duct shaft to all 6 floors of the building.

Fujitsu Microelectronics, Inc. (Currently Army National Guard)
READ MORE

Fujitsu Microelectronics, Inc. (Currently Army National Guard)

Client:

Fujitsu Microelectronics, Inc. (Currently Army National Guard)

Sector:

Manufacturing, Industrial and Commercial Facilities

Fujitsu Microelectronics, Inc. (Currently Army National Guard)

About:

  • Facilities Astronautic, Sycamore
  • Test Site & Pomona Facilities
A complete waste and vent system, domestic hot and cold water systems, industrial water systems, a nitrogen system, and a compressed air system were installed. A.O. Reed also designed and installed a complete deionized water plant on the building site. HVAC responsibilities included the installation of a central plant with centrifugal chillers, hot water boilers, steam generators, a steam humidification system and air showers for 2 large clean rooms. We also installed a large P.V.C. duct system, a fume scrubber and P.V.C. fans for exhausting fumes from the plating room. In addition, we made all final connections to owner finished equipment used in the manufacture of electronic components.
Cuyamaca College Communication Arts
READ MORE

Cuyamaca College Communication Arts

El Cajon, CA

Client:

Cuyamaca College Communication Arts

Sector:

Educational Facilities

Cuyamaca College Communication Arts

El Cajon, CA

About:

A.O. Reed assisted in the construction of the video visual arts center which consists of an auditorium, 3-story building with classrooms and labs and a 2-story office area.  HVAC consists of 7 rooftop air handlers with VAV boxes and reheat coils, HHW boiler and pumps.  Underground CHW lines to the campus central plant.  Square Footage – 95,800.The 31,000 s.f. student center consists of a 90 seat Digital Theater, 24-station Music Technology Lab, 6 rehearsal rooms and 3 recording studios.  HVAC consisted of Climatec Controls, Energy Labs air handlers with a VAV air distribution system utilizing sound traps, linear diffusers to adhere to stringent acoustical requirements.  HHW and CHW tie-ins to the existing underground central plant lines.

City of San Diego
READ MORE

City of San Diego

San Diego, CA

Client:

City of San Diego

Sector:

Manufacturing, Industrial and Commercial Facilities

City of San Diego

San Diego, CA

About:

  • Chemical Feed at Point Loma
  • South Bay Water Treatment Plant
Cal Trans – Transportation Mgmt. Ctr.
READ MORE

Cal Trans – Transportation Mgmt. Ctr.

Oakland, CA

Client:

Cal Trans – Transportation Mgmt. Ctr.

Sector:

Manufacturing, Industrial and Commercial Facilities

Cal Trans – Transportation Mgmt. Ctr.

Oakland, CA

About:

Construction of a 2-story building for Highway Patrol Command and Communications Center. The building was designed to withstand a 10.0 earthquake and to be self sufficient. Included 2 air cooled chillers, 6 AHs, 1 FC, 5 EFs, 3-525 MBH hot water boilers, 4 pumps and 51,000 lbs. of ductwork. Installed complete plumbing systems.

ATT Building B
READ MORE

AT&T Building “B”

Client:

AT&T Building “B”

Sector:

Manufacturing, Industrial and Commercial Facilities

AT&T Building “B”

About:

25,000 SF web hosting server facility with a 1,350 ton chilled water variable air volume system.