UC San Diego Graduate Housing
READ MORE

UC San Diego Graduate Housing

La Jolla, CA

Client:

University of California, San Diego

Sector:

Educational Facilities

UC San Diego Graduate Housing

La Jolla, CA

About:

A.O. Reed performed both the plumbing and HVAC on this project utilizing the Design-Build delivery method for UCSD’s East Campus Graduate Student Housing project. This project consists of multiple buildings with over 400, two-bedroom housing units and a 6-story parking structure.

UC Irvine Gross Hall
READ MORE

UC Irvine Gross Hall

Irvine, CA

Client:

UC Irvine Gross Hall

Sector:

Educational Facilities

UC Irvine Gross Hall

Irvine, CA

About:

  • Stem Cell Research Center
    • Design/Build. LEED Platinum. Total construction cost – $28 million.  New 100,000 SF, 4-story + basement, cast-in-place concrete research laboratory building with steel frame mechanical penthouse.  The facility includes a vivarium, environmental rooms, high technology library and lecture hall.  We are providing all HVAC and plumbing construction services including site chilled water; high temperature supply and return piping; site gas and air piping; motors; variable speed drives; all insulation for piping, equipment & ductwork; HVAC ductwork; fume hood ductwork; laboratory gas distribution; laboratory plumbing; acid waste systems; sanitary waste and vents; domestic and industrial water; hydronic piping; hydronic specialties; steam and condensate piping; water treatment; reheat coils; heat exchangers; air handling units; exhaust fans and fume hood exhaust fans.
  • Animal Resource Center
    • Design/Build. The 23,000 sq. ft. LEED Gold  Animal Resource Center will include a complete buildout of new vivarium space located in the basement level of Gross Hall (Stem Cell Research Center), as well as the associated work in the mechanical yard, exhaust shaft, as well as work in the existing tunnel connection.  A.O. Reed’s scope includes animal watering systems, cage exhaust, steam to the cage and bottle wash equipment, lab exhaust and Phoenix controls.
California Western School of Law
READ MORE

California Western School of Law

San Diego, CA

Client:

California Western School of Law

Sector:

Educational Facilities

California Western School of Law

San Diego, CA

About:

  • Library

Installed plumbing systems in this new 4-story, 47,478 SF library facility. Installed 76 trapped plumbing fixtures, 4,330 ft. of piping, 13 roof and overflow drains, gas fired water heater, electric instant water heater and circulating pump.

Cuyamaca College Student Center
READ MORE

Cuyamaca College Student Center

El Cajon, CA

Client:

Cuyamaca College Student Center

Sector:

Educational Facilities

Cuyamaca College Student Center

El Cajon, CA

About:

A 48,000 square foot, 2-story, Student Center consisting of a kitchen, dining area, reading rooms, study rooms and game areas. The HVAC included two Energy Labs air handling units, VAV system with DDC controls and linear diffusers for sound considerations.

AOReed Logo
READ MORE

University of California, Irvine Ice Storage

Irvine, CA

Client:

University of California, Irvine Ice Storage

Sector:

Educational Facilities

University of California, Irvine Ice Storage

Irvine, CA

About:

Replaced two 1,000 ton chillers, constructed a 2,000 ton, 40 ft. high concrete cooling tower, connected chilled water system to a 4.5 million gallon water thermal storage tank.  Piping sizes up to 24″ and 30″.

University of Southern California Teaching Library
READ MORE

University of Southern California Teaching Library

Los Angeles, CA

Client:

University of Southern California Teaching Library

Sector:

Educational Facilities

University of Southern California Teaching Library

Los Angeles, CA

About:

A.O. Reed & Co. was the sole source mechanical contractor for this multipurpose educational facility. The project involved a central plant located in a mechanical penthouse including two 260 ton chillers, boilers and a central station air handling units. The complex environmental control for the library portion of the building, along with the coordination of the plumbing, piping and sheetmetal trades throughout the building presented a challenging project. The coordination work involved in working with McCarthy and the rest of the construction team was key to the success of the project.

Palomar Community College
READ MORE

Palomar Community College

San Marcos, CA

Client:

Palomar Community College

Sector:

Educational Facilities

Palomar Community College

San Marcos, CA

About:

  • Library
  • Central Plant

Working closely with the owner-operator Energy Factors, Inc., we replaced the college’s old solar system with a modern, one-engine co-generation system. A.O. Reed installed mechanical piping and equipment, connecting the co-generation system with the main college plant and the campus swimming pool, which is heated by the system. Noise suppression was an important design consideration, as the plant is adjacent to the library building. A single-story systems building was constructed to house the generator. The system powers a 104-ton chiller to provide air conditioning for the community college.

San Diego State University
READ MORE

San Diego State University

San Diego, CA

Client:

San Diego State University

Sector:

Educational Facilities

San Diego State University

San Diego, CA

About:

  • Chilled Water Piping
  • Gateway Building
  • Humanities Building
  • Mathematics and Admin. Building
  • Physics and Geology Building
  • West Commons Building
  • Air Handler Repair Phase II
San Diego Unified School District
READ MORE

San Diego Unified School District

San Diego, CA

Client:

San Diego Unified School District

Sector:

Educational Facilities

San Diego Unified School District

San Diego, CA

About:

  • Correia Middle School
  • Dana Middle School
  • Hoover High School
  • Lincoln High School
  • Point Loma High School