READ MORE

Qualcomm Building W

San Diego, CA

Client:

Qualcomm Building W

Sector:

High-Rise Buildings and Hotels

Qualcomm Building W

San Diego, CA

About:

This project included a 4.5 mw solar mercury gas turbine generator along with one (1) 1,200 ton absorption chiller and four (4) 60 ton centrifugal chillers, cooling towers and associated pumps. Also included was a 44,000 gallon underground chilled water storage tank. This plant provides power, cooling and emergency cooling to Qualcomm’s Building W, WT and data center.

UC San Diego Meyer Hall
READ MORE

UC San Diego Mayer Hall

San Diego, CA

Client:

UC San Diego Mayer Hall

Sector:

Educational Facilities

UC San Diego Mayer Hall

San Diego, CA

About:

A.O. Reed installed the HVAC, plumbing and lab systems for UCSD’s Mayer Hall. This project included 46,000 sq. ft. of labs and 57,000 sq. ft. of remodeled labs.

READ MORE

Hotel Intercontinental (San Diego Marriott)

San Diego, CA

Client:

Hotel Intercontinental (San Diego Marriott)

Sector:

High-Rise Buildings and Hotels

Hotel Intercontinental (San Diego Marriott)

San Diego, CA

About:

The second tower of this 27-story waterfront conventional hotel was completed on schedule and $1.2 million under budget, due to value engineering and extensive use of fiberglass ducting. Our work included the mechanical and plumbing systems for 600 guest rooms, public areas, meeting and banquet rooms, two kitchens, laundry facilities, a health club, and exhaust fans for the parking garage. In addition, A.O. Reed was chosen for several later modifications, included a water re-use system for the laundry. The HVAC design was a four-pipe fan coil system. Overall, more than 35 miles of pipe were installed.

Marquis Hotel and Villas
READ MORE

Marquis Hotel and Villas

West Hollywood, CA

Client:

Marquis Hotel and Villas

Sector:

High-Rise Buildings and Hotels

Marquis Hotel and Villas

West Hollywood, CA

About:

5-story, 160 room luxury hotel and 101 unit villa style condominium, two city block under ground parking lot, 600 ton central cooling plant for the hotel and 400 tons of heat pumps for the villas; and plumbing.

READ MORE

Bank of America

San Diego, CA

Client:

Bank of America

Sector:

High-Rise Buildings and Hotels

Bank of America

San Diego, CA

About:

20-story office tower, chilled water provided from the downtown cooling district, installed HVAC and plumbing systems. This project included mechanical installation of plumbing, piping, heating, ventilating, ductwork and air conditioning. It required extensive testing and balancing.