Kaiser Zion

San Diego, CA

Client:

Kaiser Zion

Sector:

Hospitals and Laboratories

Kaiser Zion

San Diego, CA

About:

Addition of one 56,000 cfm air handler. Balanced chill water flow in Hospital ER. 90 day contract. Installed pressure monitors in 20 rooms. Overall air balancing project. Removal and reinstallation of drinking fountains, toilets, sinks and eye washes to make the hospital ADA approved.

UCSD Medical Center
READ MORE

UCSD Medical Center

San Diego, CA

Client:

UCSD Medical Center

Sector:

Hospitals and Laboratories

UCSD Medical Center

San Diego, CA

About:

Research and clinical trial facility serving the UCSD Hospitals and University. 270,000 gross square foot building that will be the UCSD Cancer Center’s new home on the east campus of UCSD adjacent to Thornton Hospital.  The new building will provide laboratory space on the upper floors for 22 Principal Investigators and their research teams.  It is projected that the structure will house approximately 300 personnel in all.  UCSD Cancer Center is one of just 38 National Cancer Institute-designated Comprehensive cancer centers in the United States.  Such centers are prominent among the leading institutions in the nation dedicated to scientific innovation and clinical excellence.  UCSD is the only Comprehensive Cancer Center in San Diego and Imperial counties to have earned this honor.  This project is comprised of two structures; a three story clinical services / administrative facility and a five story research tower that share a common base.

Trega Biosciences
READ MORE

Trega Biosciences

Client:

Trega Biosciences

Sector:

Hospitals and Laboratories

Trega Biosciences

About:

70,715 SF T.I. Project.  Laboratories. We replaced the flow controls on existing air handlers.

Sidney Kimmel Cancer Research Center
READ MORE

Sidney Kimmel Cancer Research Center

Client:

Sidney Kimmel Cancer Research Center

Sector:

Hospitals and Laboratories

Sidney Kimmel Cancer Research Center

About:

Work included retrofit of an existing two story office building into a 64,800 SF Bio-Medical laboratory facility.  30,000 SF of lab space.  Fume hoods.  DDC controls.  The building was completely gutted and all new HVAC was installed for the new use.  HVAC included 5 new AHs totaling 53,990 cfm, 25 FCs and 26 EFs.  A new central plant was built consisting of 2-250 ton screw chillers, 1-two cell cooling tower, 4-1571 MBH hot water boilers and 6 pumps.  Plumbing was installed for laboratory fixtures including double wall chemical waste lines.  A vivarium was installed on the ground floor.  Systems included DI, RO water; Lab air, gases, vacuum & waste. 20+ fixtures.

READ MORE

Mercy Hospital & Medical Center

San Diego, CA

Client:

Mercy Hospital & Medical Center

Sector:

Hospitals and Laboratories

Mercy Hospital & Medical Center

San Diego, CA

About:

Constructed 136,000 sq. ft. Outpatient clinic & administrative addition in 6 phases; concrete UG 180,000 gal 1,550 ton hour thermal storage tank with diaphragm (peak demand to be 131 tons) using 250 ton centrifugal chiller and later using a cogen wasteheat absorption chiller, HVAC & plumbing.  400 Kw 86% natural gas / 14% diesel engine cogeneration system / 100% gas emergency generator with jacket water going to a 1,000 gallon heat exchanger tank for laundry water heating.

READ MORE

Children’s Hospital Tower

Client:

Children’s Hospital Tower

Sector:

Hospitals and Laboratories

Children’s Hospital Tower

About:

This 24,000 sq. ft. project is a prime contract that included the demolition of an existing four engine cogeneration system, jacket water heat exchangers, absorption and electric chillers, cooling towers and associated auxiliary equipment.  The existing 2-story Clinical laboratory building was structurally upgraded for installation for four new cooling towers and condenser water pumps, and to meet current seismic codes.  The roof of the adjacent cogeneration building was removed for installation of a new 3.5 turbine engine generator system and the structure modified to support a new high temperature hot water heat recovery boiler, two stand-by boilers, auxiliary equipment, and to meet current seismic codes.  The project also included installation of 2 new 700 ton absorption chillers, new medical air compressors, vacuum pumps and medical gas systems.  New electrical switchgear was installed to accommodate the increased system capacity.  The cogeneration system was installed for parallel operation and “island mode” operation.  All work had to be accomplished while the hospital facilities were occupied and in full operation.

City of Hope National Medical Center
READ MORE

City of Hope National Medical Center

Duarte, CA

Client:

City of Hope National Medical Center

Sector:

Hospitals and Laboratories

City of Hope National Medical Center

Duarte, CA

About:

217 bed hospital, 84 beds dedicated to bone marrow transplant patients. We provided the Underground Steam & Chilled Water Distribution System.  Excavation over one mile trenches through high traffic areas of campus, installed over five miles of piping, twelve miles of conduit, over 30 manholes & vaults; built half mile of roadway, street repair.  Installed a 5,000 linear foot utility corridor containing chilled, steam, and 12 KVA electrical distribution in an existing 75-year old campus to feed utilities to 20 structures.  Extreme difficulties due to existing underground piping, changes in elevation and requirement to maintain proper grades on piping systems.  Existing monumental and memorial structures had to be maintained and properly stored to protect from trenching operations.  Continuous and uninterrupted service to the hospital complex was maintained while the improvements were being constructed.

Cymer Laser
READ MORE

Cymer Laser

San Diego, CA

Client:

Cymer Laser

Sector:

Hospitals and Laboratories

Cymer Laser

San Diego, CA

About:

Remodel of existing building for Class 100 clean rooms, manufacturing areas, offices and mechanical rooms.  Cymer produces Eximer lasers which are used in the semi-conductor industry.  Installed 4 rooftop AHs totaling 90,000 cfm with the largest being 27,000 cfm, 13 FCs, 28 EFs, 3 SFs and 130,000 lbs. of ductwork.  Work on this fast-track project was performed as building operations continued.

Extracts Plus (Currently Purtec)
READ MORE

Extracts Plus (Currently Purtec)

Client:

Extracts Plus (Currently Purtec)

Sector:

Hospitals and Laboratories

Extracts Plus (Currently Purtec)

About:

Furnished and installed mechanical systems for a vitamin manufacturing facility including kathabar unit, 45 ton air cooler recip chiller, 825 MBH hot water boiler, 2 pumps,  5 AHs totaling 15,200 cfm, 4 EFs and a dust collection system.  Plumbing included domestic water, waste & vent, DI water, natural gas and industrial water.