United Airlines – LAX
READ MORE

United Airlines – LAX

Los Angeles, CA

Client:

United Airlines – LAX

Sector:

Manufacturing, Industrial and Commercial Facilities

United Airlines – LAX

Los Angeles, CA

About:

Renovation of Terminals 6 & 7.  Included relocation or installation of new lavatories, kitchens, bars, equiment & mechanical rooms. Terminal 8 was also expanded and included a new mechanical equipment room, rooftop air handler units, new restaurants, bars, and lavatories.

Salvation Army
READ MORE

Salvation Army

Client:

Salvation Army

Sector:

Manufacturing, Industrial and Commercial Facilities

Salvation Army

About:

Renovation of existing 4-story office building with parking garage.  Entire building was impacted except for a portion of 2nd floor occupied by another.  (we had to work around this existing tenant during construction.  Temporary HVAC systems were installed to provide air to this tenant.  We also needed to maintain this tenant’s existing dual-duct system).  Existing parking garage area was not modified.  Total gross area:  36,551 SF.  Total T.I. Area:  27,030 SF.  We demolished majority of existing duct systems.  Installed new duct throughout bldg. (not the occupied area).  New system was a single-duct VAV arrangement with hot water reheat coils.  Existing system retained existing pneumatic controls while remainder of bldg was installed with DDC controls.  Installed two air handlers, total 52,000 CFM and largest one with 40,000 CFM, one 130-ton chiller, one boiler (90 gpm, 1,083,000 btuh), one pump, one 1.5-ton computer room fan coil unit, 76 VAV terminal boxes, DDC controls, duct cleaning of existing systems, insulation & air and water balance by NEBB-certified A.O. Reed personnel.  Existing 375 gpm cooling tower, one 25 gpm reheat coil.  4,371 LF of pipe, largest 4″; 21,867 lbs. of ductwork with largest duct 52×50.    We installed hot water heating piping mains and branch piping from existing penthouse rooftop central plant.  New piping is for new VAV boxes with reheat coils.

Relera Telecommunications (Currently Amilyn)
READ MORE

Relera Telecommunications (Currently Amilyn)

Client:

Relera Telecommunications (Currently Amilyn)

Sector:

Manufacturing, Industrial and Commercial Facilities

Relera Telecommunications (Currently Amilyn)

About:

50,000 square ft. web-hosting server facility with raised floors, 72 25-ton CRAC units.  Included condenser water cooling system.

Raytheon
READ MORE

Raytheon

Client:

Raytheon

Sector:

Manufacturing, Industrial and Commercial Facilities

Raytheon

About:

An existing electronics lab that also included offices.  Two buildings; one 1-story w/offices and one 2-story with 150,000 SF of lab space.  The project included VAV with DDC controls, chillers, computer room AC units (CRAC), and DI water system.

Qualcomm Central Plant Building “P”
READ MORE

Qualcomm Central Plant Building “P”

San Diego, CA

Client:

Qualcomm Central Plant Building “P”

Sector:

Manufacturing, Industrial and Commercial Facilities

Qualcomm Central Plant Building “P”

San Diego, CA

About:

This project included expanding Qualcomm’s existing Building “P” Central Plant by increasing the chiller capacity by 1,300 tons with the addition of a new absorption chiller and increasing their Co-Generation capacity by 4Mw with a new turbine generator.

Pomerado OSP T.I.
READ MORE

Pomerado OSP T.I.

San Diego, CA

Client:

Pomerado OSP T.I.

Sector:

Manufacturing, Industrial and Commercial Facilities

Pomerado OSP T.I.

San Diego, CA

About:

Design Assist medical office building at a total size of area of 60,000 square feet.

Linkabit Corporation
READ MORE

Linkabit Corporation

Client:

Linkabit Corporation

Sector:

Manufacturing, Industrial and Commercial Facilities

Linkabit Corporation

About:

3-story aerospace communications office and research building project consisted of the installation of general plumbing and heating, ventilation and air conditioning systems in a new steel frame building. We worked in close coordination with the owner, Architect, Design Engineer and General Contractor to complete the project within the owner’s budget and time frame.

La Jolla Gateway II
READ MORE

La Jolla Gateway II

La Jolla, CA

Client:

La Jolla Gateway II

Sector:

Manufacturing, Industrial and Commercial Facilities

La Jolla Gateway II

La Jolla, CA

About:

A.O. Reed installed all base plumbing and HVAC systems and worked on individual tenant suites. We used a unique direction expansion air conditioning system which does not use water. Instead, the system pumps liquid R-22 refrigerant directly into two 14′x12′ expansion coils of the supply air plenum. Four 125-ton refrigeration compressors produce the cooling medium and twin 150-horsepower fans cool the air and move it through a central duct shaft to all 6 floors of the building.

Fujitsu Microelectronics, Inc. (Currently Army National Guard)
READ MORE

Fujitsu Microelectronics, Inc. (Currently Army National Guard)

Client:

Fujitsu Microelectronics, Inc. (Currently Army National Guard)

Sector:

Manufacturing, Industrial and Commercial Facilities

Fujitsu Microelectronics, Inc. (Currently Army National Guard)

About:

  • Facilities Astronautic, Sycamore
  • Test Site & Pomona Facilities
A complete waste and vent system, domestic hot and cold water systems, industrial water systems, a nitrogen system, and a compressed air system were installed. A.O. Reed also designed and installed a complete deionized water plant on the building site. HVAC responsibilities included the installation of a central plant with centrifugal chillers, hot water boilers, steam generators, a steam humidification system and air showers for 2 large clean rooms. We also installed a large P.V.C. duct system, a fume scrubber and P.V.C. fans for exhausting fumes from the plating room. In addition, we made all final connections to owner finished equipment used in the manufacture of electronic components.