St. Joseph Medical Center, Burbank
READ MORE

St. Joseph Medical Center, Burbank

Client:

St. Joseph Medical Center, Burbank

Sector:

Hospitals and Laboratories

St. Joseph Medical Center, Burbank

About:

Installed a complete HVAC and plumbing system in the new hospital tower and constructed a new central plant to serve both the existing hospital and the tower. The five-story plus basement hospital tower has 120 beds, intensive-care unit, radiology, cardiovascular and outpatient services. The new central plant houses two 500-horsepower boilers and a 1,170-ton chiller. The plant includes a feedwater system, deaerator, condensate return and chemical treatment systems. We also installed a new medical air system. New underground steam, chilled water and medical gas lines connecting the old and new structures were also part of our contract. Once the new central plant was completed, we removed the boilers and feedwater system from the old central plant.

J & D Labs
READ MORE

J & D Labs

Vista, CA

Client:

J & D Labs

Sector:

Hospitals and Laboratories

J & D Labs

Vista, CA

About:

Furnished and installed mechanical systems for a vitamin manufacturing facility including kathabar unit, 60 ton air cooler recip chiller, 1,083 MBH hot water boiler, 2 pumps,  1 AH totaling 2,900 cfm and 1 FE.  Plumbing included domestic water, waste & vent, DI water, natural gas, and industrial water.

UCI Social Sciences Buildings
READ MORE

UCI Social Sciences Buildings

Client:

UCI Social Sciences Buildings

Sector:

Educational Facilities

UCI Social Sciences Buildings

About:

A.O. Reed & Co. was resposible for the plumbing, Piping and HVAC on this multiple building educational complex. The project involved integrating the four pipe HVAC system for each of the three separate structures into the main campus utility lines. The scheduling presented a challenge to coordinate all three buildings being constructed simultaneously. Our workmanship, throughout the building in each discipline was continuously praised by the University’s building inspectors.

The total project consisted of over 148,000 square feet and included clean labs and classrooms. The complexities of the project involved setting multiple air handlers in the extremely tight working space of the penthouse equipment rooms. Our ability to act as a single sorce was critical for the coordination of multiple tades involved in the equipment rooms.