READ MORE

Ontario International Airport Expansion

Ontario, CA

Client:

Ontario International Airport Expansion

Sector:

Manufacturing, Industrial and Commercial Facilities

Ontario International Airport Expansion

Ontario, CA

About:

This project included the construction of two 2-story terminal buildings totaling 556,226 SF, and tripled the size of the airport terminals. A.O. Reed installed the following: 2-525 and 3-375 ton chillers, 2-2 cell and 3-2 cell cooling towers totaling 2,175 tons, 5-1,900 MBH hot water boilers, 34 AHs totaling 391,000 cfm the largest being 30,600 cfm, 45 EFs, 10 SFs, 568,793 lbs. of ductwork, 6 factory fabricated pump stations and 6 individual pumps. The plumbing portion included 312 trapped fixtures, public & private restrooms, grease interceptors and services to stores and restaurants.

Cal Poly Pomona Central Plant
READ MORE

Cal Poly Pomona Central Plant

Pomona, CA

Client:

Cal Poly Pomona Central Plant

Sector:

Manufacturing, Industrial and Commercial Facilities

Cal Poly Pomona Central Plant

Pomona, CA

About:

A.O. Reed was the prime contractor responsible for constructing a new central plant building with 3,750 tons of cooling and a 3.1 million gallon thermal storage tank. There is over 3 miles of 24” direct buried chilled water piping serving 13 buildings of this project.

Disneyland California Adventure – Paradise Pier
READ MORE

Disneyland California Adventure – Paradise Pier

Anaheim, CA

Client:

Disneyland California Adventure – Paradise Pier

Sector:

Entertainment and Theme Parks

Disneyland California Adventure – Paradise Pier

Anaheim, CA

About:

A.O. Reed’s contribution to this Disneyland theme area consisted of 18 entertainment buildings, along with a dining and a retail store complex. In addition to the conventional HVAC and plumbing system, A.O. Reed also installed 36” fused polyethylene piping which served the 16 million gallon “Lagoon” water feature.

Barona Valley Ranch Resort
READ MORE

Barona Valley Ranch & Casino

Lakeside, CA

Client:

Barona Valley Ranch & Casino

Sector:

Casinos

Barona Valley Ranch & Casino

Lakeside, CA

About:

Barona Valley Ranch Casino & Resort is a 320,000 SF Las Vegas style gaming casino with numerous kitchens, restaurants, private gaming and a 435 room resort hotel tower. This project also included a 2,500 ton central cooling and heating plant.

Taft Correctional
READ MORE

Taft Federal Correctional Institution

Taft, CA

Client:

Taft Federal Correctional Institution

Sector:

Correctional Institutions

Taft Federal Correctional Institution

Taft, CA

About:

This project required building a new 2,048 bed federal prison. Included in the construction was plumbing, and HVAC serving the housing units, a cafeteria, library, chapel and vocational training facilities. This project also included a separate central plant building.

LAC USC Medical Carter
READ MORE

LAC + USC Medical Center

Los Angeles, CA

Client:

LAC + USC Medical Center

Sector:

Hospitals and Laboratories

LAC + USC Medical Center

Los Angeles, CA

About:

The new $1 billion dollar, 1.5 million SF LAC+USC Medical Center was a replacement hospital for the Los Angeles County Hospital. The hospital includes a 7-story clinic tower, an 8-story inpatient tower, a 5-story diagnostic and treatment building and a central energy plant. This competitive bid project includes OSHPD (Office of Statewide Health Planning & Development) approved construction. A.O. Reed was a partner in a joint venture which constructed all of the HVAC and plumbing for this project.

San Diego Museum of Art
READ MORE

San Diego Museum of Art

San Diego, CA

Client:

San Diego Museum of Art

Sector:

Educational Facilities

San Diego Museum of Art

San Diego, CA

About:

The energy modification project at the San Diego Museum of Art in Balboa Park created over $100,000 in annual electrical savings and paid for itself in 5.3 months. A.O. Reed & Co.’s close working relationship with the Building Superintendent afforded us a clear understanding of the unique demands of the gallery space. This helped us to identify existing inefficiencies and apply new technology to advance the performance of the HVAC systems. Continuous measuring, tracking and trending is leading us to even greater energy conservation than expected

Westfield ArcLight Theatre
READ MORE

Westfield Arclight Theater

San Diego, CA

Client:

Westfield Arclight Theater

Sector:

Entertainment and Theme Parks

Westfield Arclight Theater

San Diego, CA

About:

A.O. Reed’s plumbing scope included waste and vent piping, natural gas piping, installation of one drinking fountain, sixteen lavatories, concession and food prep locations, urinals, water closets and electric domestic hot water heaters re-circulating pump.

Navy BEQ 405
READ MORE

Navy BEQ P-405

San Diego, CA

Client:

Navy BEQ P-405

Sector:

Military Facilities

Navy BEQ P-405

San Diego, CA

About:

Seven story BEQ with Community Center and 162 living suites. Central plant with Air Cooled Chiller (250 ton), HHW Boiler & pumps for CHW & HHW.  Single FCU in kitchen area of living unit with ducted outlets serving each sleeping room.