Westfield UTC
READ MORE

Westfield UTC

La Jolla, CA

Client:

Westfield UTC

Sector:

Shopping Centers and Retail Facilities

Westfield UTC

La Jolla, CA

About:

  • Broadway
  • Nordstrom
  • Robinsons
  • Sears
Navy Pier 12
READ MORE

Navy Pier 12 – P327

San Diego, CA

Client:

Navy Pier 12 – P327

Sector:

Military Facilities

Navy Pier 12 – P327

San Diego, CA

About:

Design build. Navy pier 1500 ft. long, including piping services.

SoiTec
READ MORE

SoiTec

San Diego CA

Client:

SoiTec

Sector:

Manufacturing, Industrial and Commercial Facilities

SoiTec

San Diego CA

About:

A single story production building (SMB1) to manufacture concentrate Photovoltaic Solar Panels. Building is 165,600 SF and includes shipping, receiving, office space and production floor. Scope of work includes Plumbing, Process Piping, Mechanical Piping and Sheet-metal. At this time the Process Equipment Skids, Air Handling Units, Chillers, Cooling Towers & Boilers are provided by owner and set by A.O. Reed & Co.

Coronado BEQ
READ MORE

Navy BEQ Coronado, P-742

Coronado, CO

Client:

Navy BEQ Coronado, P-742

Sector:

Military Facilities

Navy BEQ Coronado, P-742

Coronado, CO

About:

The Navy has broken ground on the Bachelor Enlisted Quarters (BEQ) at Navy Base Coronado.  The project will include the construction of a, 7 story building approximately, 198,920 sq.ft. in size.  Each of the 262 modules will include a living area, four walk-in closets, stackable washers & dryers, kitchenettes and semi-private baths.  Extra measures have been taken to include fire protection, anti terrorism/force protection and data information systems.  A.O. Reed & Co will be providing the HVAC, Plumbing and Piping for this $68,000,000 project.

NOAA Lab
READ MORE

NOAA Lab

La Jolla, CA

Client:

NOAA Lab

Contract Value:

2013

Sector:

Manufacturing, Industrial and Commercial Facilities

NOAA Lab

La Jolla, CA

About:

NOAA La Jolla Laboratory Project is a 240,000 sq.ft. facility, which will include underground parking for up to 202 vehicles.  NOAA’s new laboratory will perform research for the organization’s National Marine Fisheries Service and will contain a large seawater and freshwater Ocean Technology Development Tank used to study and survey fishery resources and ecosystems.

The facility will contain an experimental aquarium, a large animal necropsy lab, a specimen processing lab, a photogrammetry lab, an ichthyoplankton lab, genetic labs, physiology labs, oceanographic labs, specimen archives, electronic workshops and a large tank for testing new sampling technologies, plus a library, conference rooms and office space for up to 300 scientists and support staff.  The building will also house the world’s largest collections of California current ichthyoplankton and tissue samples for marine mammal and marine turtle genetics.

The facility is targeted to be LEED Gold Certified.  The green design of the new laboratory includes photovoltaic cells, elaborate water retention systems, recycled materials and green roofs planted with Calif. coastal chaparral. A.O. Reed is providing all of the HVAC, Plumbing and Piping for this $102,000,000 project.

READ MORE

Century Plaza Tower Central Plant

Los Angeles, CA

Client:

Century Plaza Tower

Architect:

Shlemmer, Algaze & Associates

Sector:

High-Rise Buildings and Hotels

Century Plaza Tower Central Plant

Los Angeles, CA

About:

The project included the installation of a new central plant with temporary pump rooms in the existing parking structure of the Century Plaza Tower building. A.O. Reed installed five (5) new chillers, 6,000 tons total.  Five (5) new cooling towers @ 256 gpm each and four (4) new boilers @ 29,300 mbtu/hr total output with associated plumbing and sheetmetal work.

This central plant services twin 44 story office towers in Los Angeles.

READ MORE

U.S. Navy Measurement Lab

Corona, CA

Client:

U.S. Navy

Architect:

Larsen Carpenter

Sector:

Military Facilities

U.S. Navy Measurement Lab

Corona, CA

About:

The Naval Surface Warfare Center (NSWC), Corona Division, is the Navy’s only independent technology analysis and assessment center. This new facility is in a 39,000 sq. ft. single-story building and is earmarked to be Navy’s primary measurement facility. It contains laboratories, administrative as well as warehouse space. Its purpose: to provide critical measurement analysis of numerous top-secret military weapons and their related devices.

For the U.S. Navy’s Measurement Laboratory, the precision measurements required the lab areas to be maintained at a constant temperature with only ±0.5oF from the floor to the ceiling.

A.O. Reed & Co. received the 2002 Design/ Build Award for its contribution to this project from Contracting Business Magazine for High Technology Laboratory.

READ MORE

Tesco (a.k.a. Fresh & Easy)

Riverside, California

Client:

Tesco

Architect:

E.A. Bonelli & Associates

Sector:

Shopping Centers and Retail Facilities

Tesco (a.k.a. Fresh & Easy)

Riverside, California

About:

Tesco also known as “Fresh & Easy”, constructed a 850,000 sq.ft. food processing and distribution facility on 88 acres of land in Riverside, California. This facility included an ambient warehouse, chilled / frozen warehouse, manufacturing facility and an outer building including truck wash, fuel island, tray wash, vehicle maintenance and guard houses.

A.O. Reed’s scope of work included, 4 custom refrigerated clean room air handlers, stainless steel welded ductwork, Laminar Flow air grilles. A.O. Reed also installed rooftop exhaust fans for room pressure controls.

HVAC piping and process piping scope of work included low temperature chilled water, natural gas, culinary steam & condensate, boiler feed and process clean compressed air systems.

READ MORE

UCI Natural Sciences II

Irvine, CA

Client:

University of California, Irvine

Sector:

Educational Facilities

UCI Natural Sciences II

Irvine, CA

About:

This was a new, 4-story, 120,000 SF, biology and chemistry laboratories that was a Design/Build project. The building included fume hood exhaust, lab piping systems and HVAC.