Petco Park
Petco Park is the home ballpark of the San Diego Padres. This ballpark seats over 48,000 people and includes 47 separate food service kitchens, 69 private suites and 57 restrooms. Also included in this state of the art facility are team showers, spa, therapy pool and laundries.
Riverside Hospital
This is a five-story, 518,100 SF, 300 bed teaching hospital and medical center. A.O. Reed installed plumbing, piping and HVAC which included 3 – 570 ton chillers, 3 – 570 ton ceramic cooling tower cells, 3 – 400 hp boilers, 34 air handlers totaling 700,000 cfm, 44 EF's (including large capacity), heat exchangers, 6 FC's and over 1 million lbs. of galvanized & stainless steel ductwork. Piping systems included: hot, cold, DI, RO, lab air, gas, water and hospital medical gases including O2, N2.
Barona Valley Ranch & Casino
Barona Valley Ranch Casino & Resort is a 320,000 SF Las Vegas style gaming casino with numerous kitchens, restaurants, private gaming and a 435 room resort hotel tower. This project also included a 2500 ton central cooling and heating plant.
Callaway Golf Manufacturing Facility
This design build, two story, 250,000 SF project included both manufacturing and offices to house Callaway's corporate headquarters. It consisted of 49 air handling units, a central cooling / heating plant with 3700 tons of cooling and process piping within the manufacturing area.
Disneyland California Adventure – Paradise Pier
A.O. Reed's contribution to this Disneyland theme area consisted of 18 entertainment buildings, along with a dining and a retail store complex. In addition to the conventional HVAC and plumbing system, A.O. Reed also installed 36” fused polyethylene piping which served the 16 million gallon “Lagoon” water feature.
SD Inter. Airport East Terminal
This project consisted of a complete up-grade of the 240,000 SF East Terminal of Lindberg Field including new rooftop AHU's, piping, ductwork, electrical, ceiling and roofing.
Calif. State Prison, Calipatria
This was a new medium security prison which included HVAC and plumbing for 20 – Two story prisoner housing units and a remote central plant building.
Cal Poly Pomona Cent. Plant
A.O. Reed was the prime contractor responsible for constructing a new central plant building with 3750 tons of cooling and a 3.1 million gallon thermal storage tank. There is over 3 miles of 24” direct buried chilled water piping serving 13 buildings of this project.
MiniMed Facility
This design assist project required building a 361,000 SF research laboratory and included 110,000 SF of laboratory space. Also included were HVAC systems, fume hood exhaust, lab piping and a central plant.
Ontario International Airport Expansion
This project included the construction of two 2-story terminal buildings totaling 556,226 SF, and tripled the size of the airport terminals. A.O. Reed installed the following: 2-525 and 3-375 ton chillers, 2-2 cell and 3-2 cell cooling towers totaling 2,175 tons, 5-1,900 MBH hot water boilers, 34 AHs totaling 391,000 cfm the largest being 30,600 cfm, 45 EFs, 10 SFs, 568,793 lbs. of ductwork, 6 factory fabricated pump stations and 6 individual pumps. The plumbing portion included 312 trapped fixtures, public & private restrooms, grease interceptors, and services to stores and restaurants.
Taft Federal Correctional Inst.
This project required building a new 2048 bed federal prison. Included in the construction was plumbing, and HVAC serving the housing units, a cafeteria, library, chapel and vocational training facilities. This project also included a separate central plant building.
Emerald Shapery Center
This was a new 30 story office tower with a 27 story / 436 room hotel tower and a 30 story atrium tower totaling 750,000 SF. Included in this project is 1100 tons of chillers with a 12,000 ton – hour ice storage TES system.
First National Bank Tower
Fox Plaza
This is a new 34 story, 649,000 sq. ft. office building; including a 3000 ton central plant.
R.W. Johnson Pharmaceuticals
This new three-story, 122,300 SF Pharmaceutical Research, Biology and Chemistry Laboratories facility was built for Johnson & Johnson. Our portion of this project consisted of installation of a complete HVAC and plumbing system including steam and clean steam. Also included in the project are heating boilers @ 13 million BTU, 2-600 ton chillers, 2-600 ton cooling towers, 2-6,500 MBH hot water boilers, 3-100 hp steam boilers, 6 AHs (2 Pace 125,000 CFM) totaling 284,980, Strobic lab exhaust system, 15 pumps, 223,000 lbs of galvanized & s/s ductwork, and Phoenix constant and VAC systems for 166 fume hoods, large capacity exhaust fans, and heat exchangers. The plumbing and piping portion of the project included RO & DI water, domestic hot & cold water, industrial water, reclaimed water, compressed air, vacuum. Pure gases included N2, CO2, and hydrogen. Natural gas, process steam, sanitary waste & vent, acid waste, and storm drains. There was 21,570 ft of purity piping installed, 700+ fixtures. With extensive pre-planning and coordination, we were able to provide installation and start-up of the mechanical and plumbing systems within the seven month construction period.

Calif. State Prison, Seeley
This new medium-security prison consisted of plumbing and HVAC for 20 - two-story prisoner housing units. The project included connection of the HVAC system to the Central Plant distribution lines and the installation of 80 AHU's and 400 EF's.
Calif. State Prison, Lancaster
This new medium-security prison consisted of plumbing and HVAC for 20 - two-story prisoner housing units. The project included connection of the HVAC system to the Central Plant distribution lines and the installation of 80 AHU's and 400 EF's.
Calif. State Prison, Blythe
This new medium-security prison consisted of plumbing and HVAC for 20 - two-story prisoner housing units. The project included connection of the HVAC system to the Central Plant distribution lines and the installation of 80 AHU's and 400 EF's.
Hyatt Regency, San Diego
This Design/Build project consisted of a new 34 story tower with 750 guest rooms, kitchens, restaurants, ballrooms and meeting rooms. This project also included a new 1000 ton central cooling/heating plant.
UCI Natural Sciences I
This was A new, 4-story, 120,000 SF, biology and chemistry laboratories that was a Design/Build project. The building included fume hood exhaust, lab piping systems and HVAC.
UCI Natural Sciences II
This was a new 136,380 SF building with wet laboratories and lab support space, Bio/Bio-Eng Dept, Chem Dept., Labs, High Energy Physics Lab, Admin & Faculty offices, conference rooms.
St. Joseph Medical Center
Escondido Performing Arts Center
A.O. Reed & Co. constructed a new 124,000 sq. ft. performing arts center with two live performing theaters, conference center and art exhibit hall. Also included are four 500 ton ice harvesting thermal storage machines, conventional chillers, boilers and domestic plumbing systems.
City of Hope National Medical Center
A.O. Reed provided the Underground Steam & Chilled Water Distribution System, excavation of over one mile of trenches through high traffic areas of campus, installed over five miles of piping, twelve miles of conduit, over 30 manholes & vaults; built half mile of roadway, street repair. Installed a 5000 linear foot utility corridor containing chilled, steam, and 12 KVA electrical distribution in an existing 75-year old campus to feed utilities to 20 structures. Continuous and uninterrupted service to the hospital complex was maintained while the improvements were being constructed.
Kaiser Medical Center Fontana
This was a new six story, 225,000 SF radiology and operating facility built in the city of Fontana.
Hotel Intercontinental (San Diego Marriott)
A.O. Reed was a part of this Design/Build project for a new 27 story, 600 room waterfront hotel.
Biogen - IDEC Corporate Headquarters
Campus style layout with five multi-story buildings, providing 160,000 sq. ft. of office space and 140,000 sq. ft. of research and development laboratories. A sixth building, included in this project, is a remote central plant.
Amgen Building 29
This new four-story, 384,000 SF research and two-story underground, 224,000 SF parking structure included the installation of plumbing systems with roof drains, waste & vent, natural gas, hot & cold water, LN2, CO2, N2, compressed air, vacuum, DI water and acid lab waste; totaling over 25 miles of pipe.
Qualcomm Stadium Expansion
This Design/Build project of a 67,000 seat stadium expansion included the installation of 127 AC units totaling 755 tons, 2-4,100 gal hot water boiler, 1-75 gpm DHW pump, over 500 plumbing fixtures.
Sycuan Casino
The construction of a new two story 164,130 SF addition to the existing casino included gaming areas, restaurants, a theater, a bakery, kitchens and a new central plant. This project included a 100% outside air system for smoke removal.
UCSD Central Plant 3
A.O. Reed provided an increase of 4,000 tons to the existing central plant within the existing structure including a dual cell cooling tower with associated mechanical and electrical and an addition to the exiting emergency generator building.
UCLA Anderson Grad. School
Antelope Valley Courthouse
This was a new 4-story, 325,000 SF courthouse with 8 superior courtrooms, 70 prison cells for the LA County Sheriff. AO Reed installed a complete HVAC and plumbing system throughout.
Ventura County Jail
This was a multi building project for short term prisoner housing, including plumbing, HVAC and central plant.
Naval Hospital San Diego
A.O. Reed Installed the plumbing and mechanical systems for a new 1,000 bed military hospital.
Kyocera Co-Generation
This Design-Build project was for four 800 Kw engines totaling up to 3200 Kw, two 450 ton absorption chillers, one 750 ton centrifugal chiller and a 240,000 gallon underground 1700 ton/hr TES tank.
Moreno Valley Hospital
New four story, 104 bed, full service hospital with ER & ICU.
UCSD Bio Engineering
A.O. Reed's portion of this new 100,000 sq.ft. research laboratory building included HVAC, fume hood exhaust and process lab piping.