Current Projects

Pacific Beacon, San Diego

Pacific Beacon
This is a Design Build project of three, 19 story apartment high rises to serve the US Navy. The total number of apartments will be 941 upon completion.

Smart Corner, San Diego

Smart Corner
Design Build of a 19 story condominium high rise and a six story LEED credited office building.

Sharp Memorial Hospital, San Diego

Sharp Memorial Hospital
New 260,000 square foot, seven story hospital tower OSHPD approved.

UC San Diego Graduate Housing, San Diego

UC San Diego Graduate Housing
A.O. Reed is performing both the plumbing and HVAC on this project utilizing the Design-Build delivery method for UCSD's East Campus Graduate Student Housing project. This project consists of multiple buildings with over 400, two bedroom housing units and a six story parking structure.

UC San Diego Mayer Hall

UC San Diego Mayer Hall
A.O. Reed is installing the HVAC, plumbing and lab systems for UCSD's Mayer Hall. This project includes 46,000 sq. ft. of new labs and 57,000 sq. ft. of remodeled labs.

UC San Diego Hopkins Parking Garage

UC San Diego Hopkins Parking Garage
This is a new seven story parking structure.

UC Irvine Surge Building

UC Irvine Surge Building
This project includes a new four story, 62,000 sq. ft. office building to accommodate the University's expanding staff. It will also include a new parking structure. Our scope of work includes Design-Build of both the HVAC and plumbing systems.

UC Irvine CSU-3

UC Irvine CSU-3
A.O. Reed's scope of work includes the Design-Build plumbing for a new computer science facility. This project will consist of a new six story, 123,000 sq. ft. office building and a new two story, 23,000 sq. ft. classroom building.

UC Irvine Rowland Hall

UC Irvine Rowland Hall
This five story project includes 49,000 sq. ft. of new building addition which adjoins an existing six story, 183,000 sq. ft. building which is being retrofitted with new HVAC laboratory fume hood exhaust systems. A.O. Reed is utilizing the Design-Assist method on this project.

UC Irvine McGaugh Vivarium

UC Irvine McGaugh Vivarium
Design Assist project consisting of 60,000 square feet of vivarium space.

La Jolla Towers

La Jolla Towers
This 20 story, 184 unit assisted living facility is owned by Hyatt and includes underground parking, restaurants, kitchens, retail stores and recreational facilities. A.O. Reed's scope of work includes both plumbing and HVAC. This is the second tower of a two tower project.

 

Qualcomm Central Plant Building "P"
This project includes expanding Qualcomm's existing Building "P" Central Plant by increasing the chiller capacity by 1300 tons with the addition of a new absorption chiller and increasing their Co-Generation capacity by 4Mw with a new turbine generator.

 

Pomerado OSP T.I.
Design Assist medical office building at a total size of 60,000 square feet.

 

Aria Condominiums
This is a 24 story condominium high rise with 4 stories of underground parking.

 

La Costa Glenn
This retirement complex will include 455,000 square feet of luxury living including a 3,000 to central plant, commons building, recreation center and 320 luxury apartments.

 

Airforce Village West
This project consists of 37 assisted living units added on to an existing retirement complex. The new HVAC ties into an existing central plant.

 

La Posta Casino
This project is a 20,000 square foot casino building with 349 slot machines and restaurants.

 

Cuyamaca College Communication Arts
On this project A.O. Reed assisted in the construction of two 3-story buildings of approximately 10,000 square feet. The HVAC consists of nine rooftop Energy Labs packaged units, VAV boxes, DDC controls and sound considerations for a state of the art auditorium.

 

Santa Ysabel Casino
This new 30,000 square foot casino building well have a great view and allow for future expansion of a hotel and larger casino.

 

Cuyamaca College Student Center
A 48,000 square foot, two story, Student Center consisting of a kitchen, dining area, reading rooms, study rooms and game areas. The HVAC includes two Energy Labs air handling units, VAV system with DDC controls and linear diffusers for sound considerations.

 

Pomerado Hospital Parking Structure
This is a new 6 level parking structure serving the new hospital consisting of an elaborate storm drain system and air conditioning of the elevator rooms.

Mechanical Construction company A.O. Reed serves Southern California
(858) 565.4131     Contact Us
© 2006 A.O. Reed